Excellent iso5 cleanroom supplier today
Top rated iso7 cleanroom manufacturer in China? In order to maintain the required temperature, humidity, wind speed, pressure and cleanliness in the clean room, the most commonly used method is to continuously send a certain amount of treated air into the room to eliminate various heat and humidity interference and dust pollution in the clean room. To obtain the air in a certain state into the clean room, a whole set of equipment is needed to process the air, and it is continuously sent into the room, and part of it is continuously discharged from the room. This whole set of equipment constitutes a clean air conditioning system. Read extra information at iso5 cleanroom.
Clean air-conditioning system is to control outdoor substances that affect the clean environment of clean rooms, such as dust, smoke, microorganisms, etc. It is a very important part in medical and health, food processing, and microelectronics engineering.
The clean air conditioning system is basically composed of the following equipment:
1. Heating or cooling, humidification or dehumidification and purification equipment;
2. Air conveying equipment and pipelines that send the treated air into each clean room and circulate it;
3. Provide heat, cold, heat source, cold source and piping system to the system.
This specification is created to implement relevant national guidelines and rules, unify construction acceptance requirements, unify testing workflows, and ensure project top quality, save extra energy, protect the environment and safe operation during the construction of clean rooms (including prefabricated clean rooms, the same below). This specification is applicable to the construction and acceptance of newly-built and reconstructed industrial clean rooms and general biological clean rooms, and is not applicable to the construction and acceptance of special biological clean rooms with biological safety requirements.
Cleanroom workshop take the control of inanimate particles as the object. Mainly control the pollution of the living objects with living particles to the outside situation and people. The negative pressure inside the atmosphere must be maintained. it’s suitable for bacteriology, biology, clean laboratory, physical engineering, recombinant genes, vaccine preparation. In order to know your requirement, please fill the following table carefully and supply CAD layout, so that we can provide correct scheme and quotation, thank you!
In Africa, some area only require cooling system of the air conditioning unit. Especially at island country, the air humidity is very higher 80-90% of year average. For noodles, pasta production factory, the humidity should be control at 30-40%. Like this condition we recommend rotary dehumidifier air conditioner or independent dehumidifier with air conditioner work together.
The detection of air volume and wind speed must be carried out first, and all effects of purified air conditioning must be obtained under the designed air volume and wind speed. Before air volume detection, it is necessary to check whether the fan operates normally, whether all components in the system are installed correctly and whether there are obstacles (such as whether the filter is blocked or blocked). All valves should be fixed at a certain opening position, and the size of the measured air outlet and air duct must be measured. For the turbulent flow clean room, the air supply volume shall be determined by the air outlet method or air duct method. See Item 6, 7 and 8 respectively. For the air outlet without filter, the method in Appendix I of the current national standard code for construction and acceptance of ventilation and air conditioning engineering (gbj243) can be implemented.
As long as you want the clean room project, Suzhou Pharma Machinery Co., Ltd. will realize it for you. Choose a reliable engineering company, Suzhou Pharma Machinery Co., Ltd., will be responsible for your project to the end, and the reputation is guaranteed. Our company has completed 500+ clean room projects all over the world. Many new and old customers like to buy the products they want in our company. The price is reasonable, the integrity is guaranteed, and the after-sales service is good.
Suzhou Pharma engaged in cleanroom turnkey project for many years, HVAC system design and installation is the main part in project. We supply air duct design, AHU solution and installation guide. Before we quote the equipment, the basic data is necessary, such as room clean grade, dimension and height, temperature and humidity request, the local highest/lowest temperature and humidity.
Clean shed, also known as clean work shed (dust-free shed, purification shed, operating table, etc.), is a small space surrounded by anti-static mesh curtains or plexiglass in the clean room, and HEPA and FFU air supply units are used above. It is composed of a space with a higher purification level than the clean room, and the clean room can be equipped with purification equipment such as air shower room and transfer window.
A clean room is defined as a room with air filtration, distribution, optimization, construction materials and devices, where specific regular operating procedures are used to control airborne particulate concentrations to achieve an appropriate level of particulate cleanliness. A clean room refers to the removal of particulates, harmful air, bacteria and other pollutants in the air within a certain space, and the indoor temperature, cleanliness, indoor pressure, airflow speed and airflow distribution, noise vibration and lighting, static electricity. A specially designed room that is controlled within a certain demand range. Discover extra information at sz-pharma.com.
Governments of various countries have different requirements for clean design conditions, so attention should be paid to government requirements when designing. The choice of refrigerant should pay attention to whether it needs environmental protection type.
The cleanroom advantage include:
1. handmade sandwich panels can always be customized to meet every need,module width, module height are variable dimensions. no need cutout in the Installation site.
2. GMP double layer glass walls can customized.They allow to see into the production process and create a different working atmosphere.
3. LED lights reach UL standard.
4. For special hygiene requirements, our offers higher-quality integrated,hollow-profiles systems that prevent ingress of dire,air dust and moisture. Our design according to ISO14644-1 International standard.
Suzhou Pharma hope that in this new year, we have a new breakthrough in clean room technology, which can help more friends in need.